Food hall and offices in a 19th-century mill
- Location
- Łódź · former textile factory
- Area
- about 5,000 m² across three floors
- Client
- Investor or hospitality operator
- Indicative programme
- 18 to 24 months, including approvals
UCG Poland is opening in Poland. These are concept studies, not completed projects in Poland, and every image is an illustrative visual. They show how we would plan and deliver each type of building. Completed work will be added here as it is handed over.
Concept study · Adaptive reuse
Łódź · former textile factory
Łódź is Poland’s capital of adaptive reuse: former mills and power plants now house shops, restaurants and offices at Manufaktura, Monopolis and Fuzja. This study turns a red-brick textile factory into a ground-floor food hall with offices above and a new glass entrance pavilion.
What we would deliver
- Structural survey and repair of brick walls, vaults and cast-iron columns
- Food counters with shared kitchen extraction and grease management
- Offices on the upper floors with new lifts and stairs
- Glass and steel entrance pavilion
- Courtyard landscaping and outdoor seating
Polish approvals
- Heritage conservator’s permit for the listed factory
- Building permit including the change of use
- Fire safety agreement for a large open hall
- Sanepid approval for each food counter
Concept brief
- Area
- about 5,000 m² across three floors
- Client
- Investor or hospitality operator
- Indicative programme
- 18 to 24 months, including approvals
Illustrative visuals.
Design-build
How we would deliver it
- 01
Feasibility
Site, zoning plan and budget reviewed, with a clear answer on whether the scheme works and what it will take.
- 02
Design
Architecture, structure and services designed together, with the build cost tracked from the first sketch.
- 03
Approvals
Heritage, building permit, Sanepid and fire-safety approvals prepared and followed through to a decision.
- 04
Construction
One project manager, a written programme and a report with site photos at every milestone.
- 05
Handover
Commissioning, inspections, as-built documents and the occupancy permit, so you can open on time.